Redevelopment of the site comprising site preparation works and erection of seven new buildings ranging from 8 storeys to 30 storeys to provide 856 dwellings (Use Class C3) (1-bed, 2-bed, and 3-bed) and 2,513sqm (GIA) employment space (Use Class E), alongside basement, communal amenity space, car parking, cycle parking, refuse storage, landscape, public realm improvements and other associated works.
Vision for Crown Wharf is to bring this key riverside site back to life. The proposals responds to one of London’s current challenges; the optimisation of accessible brownfield land, positively embracing colocation to ensure workspace is local and street facing and well integrated with Residential Homes above.
Landscaping has been placed at the forefront of the design to promote access to the River Lea, whilst creating a safe and beautiful spaces for the residents, workers and the public to enjoy.
Vision for Crown Wharf is to bring this key riverside site back to life. The proposals responds to one of London’s current challenges; the optimisation of accessible brownfield land, positively embracing colocation to ensure workspace is local and street facing and well integrated with Residential Homes above.
Landscaping has been placed at the forefront of the design to promote access to the River Lea, whilst creating a safe and beautiful spaces for the residents, workers and the public to enjoy.
Facts and Figures
Appointment Year
2023
Completion Year
2024
Area
Client
M+A
Scope
– BIM Consultancy.
– BIM Coordination.
– 3D BIM Production.
– BIM Coordination.
– 3D BIM Production.